FC Maximizer Dissolved Air Floatation Clarifier Installations

Installation of the FC Maximizer clarifier is straightforward. The clarifier tank and other assembly parts are bolted together. Assembly requires no onsite welding. The Royall DAF clarifier is compact and easy to handle. When filled, floor loading is approximately 150 lbs/ft2 of clarifier surface area. The FC Maximizer clarifier can be installed on concrete pads, elevated steel platforms, or above other machinery.

Examples of installed DAF FC Maximizers are shown below. These clarifiers can be installed indoors or outdoors. The relatively low floor loading, 150 lbs/ft2 of tank surface area permits their installation in elevated positions, above other equipment, and on roofs.

Installation Example 001
Installation Example 002
Installation Example 003
Installation Example 0041
Installation Example 005
Installation Example 006
Installation Example 008
Installation Example 009
Installation Example 010
Installation Example 011
Installation Example 012
Installation Example 013
Installation Example 014
Dissolved Air Flotation Systems
Installation Example 014