Dissolved Air Flotation Clarifiers FC Maximizer Installations
Installation of FC Maximizer clarifiers is straightforward. The clarifier tank and other assembly parts are bolted together. Assembly requires no onsite welding. The DAF Corp. clarifier is compact and easy to handle. When filled, floor loading is approximately 150 lbs/ft2 of clarifier surface area. The DAF, FC Maximizer clarifier can be installed on concrete pads, elevated steel platforms, or above other machines.
Examples of installed DAF FC Maximizers are shown below. These clarifiers can be installed indoors or outdoors. The relatively low floor loading, 150 lbs/ft2 of tank surface area permits their installation in elevated positions, above other equipment, and on roofs. Assembly of 12' dia. DAF Maximizer clarifier. 15' dia. DAF Maximizer clarifier being installed. One day 3 men. DAF FC-240, 24' dia. clarifier minutes before starting up. Typical 15'DAF Maximizer clarifier operating rotating scoop - Food Industry. Typical outside installation of a DAF Maximizer with electrical Overhead view of 15' FC Maximizer installed at a food processing facility. These clarifiers can be installed indoors or outdoors. The relatively low floor loading, 150 lbs/ft2 of tank surface area, permits their installation in elevated positions, above other equipment, and on roofs. |
DAFCorp Home Page
DAF CORPORATION | Telephone: (920) 766-6052 | Facsimile: (920) 766-6054 | E-mail: sales@dafcorp.com
Milwaukee web design: Byte Studios